Supply of ventilation equipment to Ireland’s first LEED Gold building
Active chilled beams are used for both heating and cooling. Ground water is used as a source for heating with a heat pump while cooling is provided with a combination of groundwater and chilled water. Free Cooling is also implemented. Ventilation: 100% fresh air supply with AHU’s incorporating a thermal heat recovery and dehumidification wheel.
A wide range of products were used to achieve the LEED Gold rating:
Multi-functional and easy to clean ceiling diffuser with swirl panel and integrated plenum.
Terminated as of July 2023
> Replaced with JWC
Draught free square swirl diffuser for ceiling installation.
Circular exhaust valve with attenuation. A manually adjusted supply valve in ceiling installation.