Design, supply and installation of Air Handling Units – Plant Room
Installation required working within the existing hospital and maintaining operation to the rest of the hospital and minimal disruption the existing ward layout and finishes.
Despite the tight constraints imposed by the existing building and working within an operational and sensitive environment, the project was a success.
Following the supply of 15 no. HTM 03-01 air handling units to St. Vincents Hospital, we were requested by St. Vincents to propose a system to ventilate and air condition St. Annes Ward.
Our solution was to replace the existing radiant panels with active chilled beams to provide heating, cooling and ventilation. This had a number of advantages over traditional ventilation systems:
Heat recovery units that can be modified on site, with horizontal or vertical layout. Range with 10 models from 100 to 3.500 m3/h . Compact and versatile.