Design, supply and installation of new chilled beam system to existing St. Annes Ward
Following the supply of 15 no. HTM 03-01 air handling units to St. Vincents Hospital, we were requested by St. Vincents to propose a system to ventilate and air condition St. Annes Ward. The existing ward had ceiling mounted radiant panel heating and natural ventilation using openable windows. Overheating was a problem due to solar heat gain.
Our solution was to replace the existing radiant panels with active chilled beams to provide heating, cooling and ventilation. This had a number of advantages over traditional ventilation systems:
Installation required working within the existing hospital and maintaining operation to the rest of the hospital and minimal disruption the existing ward layout and finishes.
Despite the tight constraints imposed by the existing building and working within an operational and sensitive environment, the project was a success.